Waste pits

Pits designed for separate waste placement:

  • Pit №1 is designed for domestic solid waste placement.
  • Pit №2 is designed for construction waste (closed).
  • Pit №3 is designed for hazardous waste placement. Base quantity of hazardous waste placement – ash after incineration (thermal deactivation), glass scrap after demercurization, immobilized dead batteries and so on.
  • Pit №4 is designed for construction and domestic and solid waste placement.
  • Pit №5 is designed for bioremediation.
  • Pit №6 is designed for slush residue.

In 2014 Company completed design project for construction of evaporation ponds for treated waste water: 2 pits with a total capacity of 250 000 m3/year.

Construction schedule will depend on the actual demand for this facility.